St David’s Hospital

St David’s Hospital is managed by the Cardiff and Vale University Health Board. The original main block of the hospital is a Grade II listed building. The newer 100 bed facility was designed by HL Design and built by Macob Construction at a cost of £16 million and opened on Saint David’s Day 2002.
Contracting client: 
IMC St David’s
Location: 
Cardiff, Wales
Sector: 
Healthcare
Key Elements
  • Fire Safety Strategy
  • Review of existing building
  • Site visits and inspections

The Challenge

Kiwa Fire Safety Compliance were asked to review the efficacy of the existing fire safety strategy against the as-built drawings of the site, to ensure the documents were accurate, complete and suitable for the building.

As the hospital was built in 2002, the client was keen to seek a review to ensure the building still complied with current building regulations and guidance.

The Solution

Through site visits, some invasive inspections and a thorough analysis of the existing strategy, IFC was able to clarify and recommend engineering solutions to compartment walls that would help the building achieve compliance.

The Outcome

From our work the client received both assurances of the quality of their installations already in situ, as well as the ability to plan any remedial actions as necessary.

Kiwa Fire Safety Compliance identified where installations and compartments were satisfactory, ensuring the client was not put in a position of unnecessary expenditure or overprovision.

Download Case Study (PDF 308kb)

 

Our offices will be closed from 4pm Monday 23 December 2024 to Thursday 02 January 2025.
Merry Christmas and a Happy New Year from everyone at Kiwa Fire Safety Compliance.
This is default text for notification bar